What are you looking for?

Project requirements & acceptance

Define quality
before the build.

A shared manufacturing and inspection plan helps turn a CAD model into an assessable result.

Trust through clear requirements

Quality is a project plan,
not a stock promise.

Agree what will be measured and documented before manufacture. Critical features, inspection methods and acceptance criteria should be visible on the approved drawing.

This website does not claim AS9100, ISO certification, approved aerospace-supplier status or flight qualification. Any required certificate or process approval must be checked for the specific supplier, scope and project.

Specify the evidence you need

  • Material grade and any required material certification
  • Part number, revision and batch identification
  • Critical-dimension measurement requirements
  • Heat-treatment and finishing documentation
  • Surface condition and cosmetic acceptance
  • CT, leak, mechanical or other testing, if required and agreed
  • First-article approval before repeat production
From enquiry to acceptance

A clear route from CAD to delivery.

01 / Define the application

Provide CAD, drawing revision, quantity, intended use, operating conditions and target date. Identify confidential information before sharing files.

02 / Review manufacturability

Review geometry, build orientation, support access, powder removal and finishing allowances. Confirm any design changes before proceeding.

03 / Agree the quotation

Confirm material grade, scope, inspection, documentation, lead time, shipping and commercial terms in writing. Catalogue prices are not binding manufacturing quotes.

04 / Freeze the revision

Approve the drawing and manufacturing plan. Revision changes after approval may affect cost, schedule and acceptance criteria.

05 / Build & verify

Follow the agreed production and post-processing route. Inspection is performed to the scope accepted in the quotation, not an assumed universal tolerance.

06 / Deliver & review

Check part identification, agreed records and packaging. Report nonconformities with photographs, measurements and the relevant drawing reference.

What to agree before production

Drawing control

Specify part number, revision, units, datums, critical dimensions, tolerances, threads and finish. A CAD model alone does not define every acceptance requirement.

Inspection scope

Identify measured features and methods. Request dimensional reports, material records, CT, leak or mechanical testing only where relevant; availability and cost require confirmation.

Use and validation

Prototype acceptance does not establish fitness for road, race or flight use. The responsible engineering team must define the validation and regulatory route.

Delivery & issue resolution

Delivery dates, packaging, shipping terms, taxes and import responsibilities are agreed in the quotation. Confirm inspection and documentation before the order is released.

If a result differs from the approved specification

Retain the part and packaging. Provide the order reference, part number, drawing revision, photographs and measurement evidence. The issue is reviewed against the accepted requirements and agreed order terms.

Custom-order cancellation, rework or return arrangements must be confirmed in writing. This page does not override applicable law or a signed agreement.

Start with a useful brief

Better inputs.
A clearer quotation.

Send your project files and the information below to myricearsoninad@gmail.com. Do not treat a catalogue selection or a zero-priced listing as an accepted production order.

Lead time begins only after the scope, files and commercial terms are agreed. Availability and delivery dates are confirmed per project.

Your enquiry checklist

  1. Company, contact and delivery country
  2. STEP or other agreed CAD format, plus a dimensioned PDF drawing
  3. Part number, revision, units and quantity
  4. Application, operating environment and critical functions
  5. Material grade, finish, tolerances and threaded interfaces
  6. Inspection, testing and documentation required
  7. Target date, repeat-volume expectations and confidentiality needs